The Town Board inspected our roads on April 25, 2023. The individuals present were Ted, Lloyd & Dwayne.
The board had general discussions on filling potholes. The board made the following notes on items that will be considered when doing road bids this year:
- Hickory Lane
- Replace Large culvert, fill in small culvert
- Sealcoat
- Rocky Lane – Complete
- Hillside Drive – Hwy B to Northside Dr
- Pave/Overlay
- Willow Glen – Hwy B to Concord Center Drive (.6 Miles)
- Bakertown – Where we left off last year to aprox W1609 (.6 Miles) & All the way to Pioneer (.4 Miles)
- Pioneer – From Sullivan town line north to Bakertown (1.5 Miles)
Pick content type:
publish:
Wednesday, September 27, 2023 - 7pm